Friday, April 26, 2013

April 26 - Floor is Done

Today was a beautiful day for pouring concrete floors! According to the weather reports, it was the warmest day we have had in 190 days...it got to about +14C!!
Camera malfunction on the first two pictures, sorry they are a little blurry...but they help to tell the story. Marshall went out about 11:00 am to see how things were going. They had poured the floor already and were there til about 6:00 pm smoothing it out.

The last concrete truck to leave.

The pump and pipe that carried the concrete to the basement (through the window on the west side).

Just poured and still wet.

Above & below, the guys working on the floor. 

Using the power trowel and sprinkling water on the floor. The floor will be dry enough to walk on it tomorrow. What we could see from looking down into the basement, the floor looked great! Very exciting!