Re-bar in dips and tarps left on site to cover the doors after concrete is poured.
Garage floor is poured, waiting for the power trowler guys to do their thing. (The same machine as was used for the basement floor). Tarps are covering the doors to try to keep some warmth in there.
Above & below...all smoothed out. These guys do great work!!
All done. In a week we can drive on it. 3 overhead doors, 2 man doors & 3 garage door openers are on order...soon will be sealed up from the elements & ready to use. :)