The ground has been dug and the drainage pipes laid. The pipes sticking out of the ground at the far end are for the bathroom we will be putting down there.
Thawed enough that there is water...we will get the sump pump going as soon as it thaws out.
Plumbing in main bathroom.
Plumbing in ensuite. Boxes in the walk in closet (behind) are what is needed to install the wood stove.
Plumbing in the 2 pce bathroom off the mudroom. Blue tarp in the background is covering the basement stair opening to keep the heat downstairs.