Here's what's been done:
- a partial backfill
- the septic tank was installed and the line ran to the back where the septic field will be
- the posts were hammered into the ground where the piles will be located for the garage, front veranda and back deck
- we have decided to put the septic field into the bush as much as we can to free up yard space. In order to do this we had to move camp out of the way so the bush could be cleared. The field has to be 100' from the river so it will still be in the yard about 25' or so.
The septic tank was just installed and Kenny is working on installing the line. |
The scaffold ready to work on the floor above.
|
The markings where the piles will be put for the garage.
|
The lumber for the floor & walls and in the background you can see that camp has been moved to the south east corner of the yard
|