Light has been installed in main bathroom shower (Alanna & Joel did this a while ago).
Mirror is now up in 2 pce bathroom.
Henri's painting all the baseboards & trim.
HRV ducting in basement. Central vac on wall.
The nice tidy wiring job that Alanna is doing. Coils on the left are TV, intranet & phone.
Awesome steps that Henri built. We were using the little step that Marshall built for me for the camper (pictured here under the new steps).Railing is in the corner to the left of the door.
No comments:
Post a Comment