Alanna & Joel worked on some electrical stuff for a few hours today...light was installed in the main bath tub; 2 light fixtures were installed in the car bay of the garage; outlets & switches were installed in garage, including the one for the garage door opener in the car bay and it is now plugged in; Alanna drilled the hole for the plug in the island & then she had to leave so Joel helped Henri put up some drywall in the shop bay of the garage. Once Henri is done the shop we can work on cleaning out the pile of 'stuff' in the truck bay & start getting organized out there. Then the lights can go up on the truck side, install the heat sensor & install the outlet for that garage door opener.
Alanna committed to drilling the hole through the cabinet & floor!
Lifting up the first sheet of drywall for the shop.
And the first sheet goes up!! Once the ceiling is dry walled the dividing wall can be finished (drywall, vapour barrier, insulation & osb on the shop side).
Thanks Guys!