I was out at the house for a few hours today to see what's what and took more pictures for Marshall (& believe it or not, did some tidying - job for next weekend once closets are done!)...have a look. Lucky for us, Henri is available most of next week to continue working on the house & last week he gathered a crew (Abel, Gil & Marc) to accomplish lots. 
Merl (the closet guy) started on Friday and should be done all of the closets by Wednesday (except for some back ordered shelves for the master walk-in). Henri is working on painting all the bi-fold closet doors so they will be up next week as well. Baseboards & trim is almost complete...electrical is almost complete...just gotta get our HVAC guy on site long enough to finish up!!! Looking more and more finished every day!!

Below 2 pictures are the firewall between the shop bay and the car/truck bays. This goes all the way up through the rafters to the roof.


Below 2 pictures are the shop. OSB on the shop side (easy to hang tools, shelves, etc) drywall on the car bay side. This is all insulated & I will arrange to have the ceiling blown in within the next few weeks. Lights, heat detector & garage door opener need to be installed.


Appliances arrived a couple weeks ago and were put in place last week. Just need to unwrap them now. 

Trim around the window is done.

Pocket door between mudroom & dining room. The same as the one on the 2 pce bathroom & between front hall and mudroom.

Henri surprised us with a lovely shelf for the front entrance.

En-suite shower door.

Trim around front hall closets (to be installed once painted) and door to basement & fixture in basement stairwell. Some of the trim needs to be filled and second coat of paint.